• Guards Ark : Constuction Drawings and Permits - AutoCad - Cadd in NYC
  • Guards Ark : Constuction Drawings and Permits - AutoCad - Cadd in NYC
  • Guards Ark : Constuction Drawings and Permits - AutoCad - Cadd in NYC
  • Guards Ark : Constuction Drawings and Permits - AutoCad - Cadd in NYC

1 of 3

This drawing indicates the cornice elevation typically. All the intricate ‘bar relief’ and ‘dentil’ details are shown. They match the existing cornice as per Landmarks Commission requirements.

autocad project image

2 of 3

This detailed cornice section drawing indicates all the intricate connections required to hang the structure securely to the parapet wall, with a guarantee to last for at min. 20 to 25 years. The small gap between the top of the parapet wall and the cornice is protected with a continuous drain pan with flashing to divert all water from the steel brackets to prevent rusting. The cornice was mocked up at least 3 times and adjusted, per Landmarks Requirements, before the final section to be used was decided upon.

autocad project image

3 of 3

Testing the look of the cornice in color and texture. Thus, the section and elevation is shown. The drawing speaks for itself.

autocad project image

logo image